- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 【】奥特莱斯啤酒音乐节活动方案.doc
- 【】组织行为学复习总结.doc
- 【京东商务学院】推荐的本经典书籍,.doc
- 【DOC】成功的第一桶金.doc
- 【doc】水处理絮凝剂的应用及研究进展.doc
- 【QC大手法精选教程】=品管新七大手法精选之教程【T】.docx
- 【不看后悔】《结婚时间安排表》 女生必看,男生珍藏,留着备用【收藏】.doc
- 【产后减肥】妈妈产后的条饮食秘诀.doc
- 【免费】大学生思想汇报篇.doc
- 【名师原创 全国通用】学高一寒假作业 政治五Word版含答案.doc
- 某县纪委监委开展“校园餐”突出问题专项整治工作汇报22.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告66.docx
- 某县委常委、宣传部部长年度民主生活会“四个带头”个人对照检查发言材料.docx
- XX县委领导班子年度述职述廉报告3.docx
- 某县纪委关于校园餐问题整治工作落实情况的报告.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告22.docx
- 某县税务局党委领导班子年度民主生活会“四个带头”对照检查材料.docx
- 某县委书记在县委常委班子年度民主生活会专题学习会上的讲话.docx
- 某县纪委校园餐问题整治工作落实情况的报告.docx
- 某区委副书记、区长年度民主生活会对照检查材料.docx
文档评论(0)