- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国民法继受潘德克顿法学:引进衰落和复兴上
文章来源:中顾法律网
上网找律师 就到中顾法律网 快速专业解决您的法律问题
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color
您可能关注的文档
- 万物大字典 词汇大集合中英日.doc
- 三八妇女节送什么礼物,女人节BLOVES婚戒独家盘点.docx
- 三体系内审检查表[].doc
- 三星S内存扩容方法.docx
- 三百句心理健康的名言警句转载.doc
- 三级下音乐教案.doc
- 三国法周超.doc
- 三水环境容量计算演示稿.doc
- 三月保险新闻聚焦.doc
- 三级第一学期健康教育教案.doc
- 鹤山市纪元中学2024-2025学年高二上学期期中考试数学试卷(含答案).docx
- 广东省2025届高三上学期普通高中毕业班第二次调研考试数学试卷(含答案).docx
- 甘肃省兰州市永登县2024-2025学年二年级上学期期中数学试卷.doc
- 湖北省新高考2024-2025学年高一上学期11月期中考试数学试卷(含答案).docx
- 湖北省部分重点中学2025届高三上学期第一次联考数学试卷(含答案).docx
- 甘肃省兰州市永登县2024-2025学年四年级上学期期中数学试卷.doc
- 江苏省淮安市2025届高三上学期第一次调研测试数学试卷(含答案).docx
- 江苏省淮安市高中校协作体2024-2025学年高一上学期期中联考数学试卷(含答案).docx
- 2024-2025学年初中英语六年级下册上海新世纪版教学设计合集.docx
- 辽宁省朝阳市重点中学2024-2025学年高一上学期11月期中联考数学试卷(含答案).docx
文档评论(0)