- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中英文对照视音频术语汇编
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 下带式输送机任务书.doc
- 世界未来大趋势.doc
- 上海输配电气PSW说明书中英文版.doc
- 世界所有汽车标志及其含义[].doc
- 世界魔鬼训练书.doc
- 世界顶级大著名品牌运动鞋标志设计欣赏.doc
- 世界项目建议书苏州王海.doc
- 世界汽车品牌车标及简介.doc
- 世界汽车车标收齐了哦.doc
- 世纪人类学研究评述.doc
- 福建省龙岩市龙岩北附2025届高三下学期联考历史试题含解析.doc
- 云南省昆明市师范大学附属中学2025届高三第五次模拟考试生物试卷含解析.doc
- 教你写合同必威体育精装版安置房买卖合同协议6篇.docx
- 安徽省淮南一中2025届高考全国统考预测密卷化学试卷含解析.doc
- 山西省芮城中学2025届高三第二次联考化学试卷含解析.doc
- 2025届浙江省杭州市杭州七县市区高考压轴卷生物试卷含解析.doc
- 黑龙江哈师大附中2025届高考生物全真模拟密押卷含解析.doc
- 天津市东丽区军粮城第二中学2025届高三最后一卷生物试卷含解析.doc
- 浙江省杭州市浙大附中2025届高三第三次测评生物试卷含解析.doc
- 商场场地经营权租用合同6篇.docx
文档评论(0)