- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
互联网时代新闻报道新思维李良荣pdf
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国BC网站比较.doc
- 中国优秀旅游城市广安.doc
- 中国历房地产调控政策.doc
- 中国人大中国古代史打印版.doc
- 中国古代史名词解释从三国开始.doc
- 中国古代史复习笔记一.doc
- 中国名菜潇湘风味畜肉类.doc
- 中国品牌强.doc
- 中国哈尔滨国际供热计量产品展览会.doc
- 中国国际起源地文化论坛方案议程.doc
- (高清版)DB52∕T 689-2010 烤烟专业队伍建设作业规范 专业烘烤队伍.pdf
- (高清版)DB52∕T 692-2010 贵州省温泉旅游设施与服务.pdf
- (高清版)DB52∕T 713-2015 地理标志产品 雷山银球茶.pdf
- (高清版)DB52∕T 679-2010 贵州省标准化烟叶站(点)建设规范.pdf
- (高清版)DB52∕T 687-2010 烤烟专业队伍建设作业规范 专业植保队伍.pdf
- (高清版)DB52∕T 685-2010 烤烟专业队伍建设作业规范 专业育苗队伍.pdf
- (高清版)DB52∕T 705-2011 人工马尾松地径材积表.pdf
- (高清版)DB52∕T 722-2011 白栎次生薪炭林经营技术规程.pdf
- (高清版)DB52∕T 743-2012 金属冶炼行业 自吸过滤式防尘口罩.pdf
- (高清版)DB2201∕T 8-2021 行道树栽植与养护管理技术规范 .pdf
文档评论(0)