- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人气策划婚礼c
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 中外名画赏析维米尔《戴珍珠耳环的少女》.doc
- 中大网络教育学院大专下半《秘书与公文写作》第一次作业.doc
- 中国高血压诊疗指南与专家共识 张义才第一版Microsoft Word 文档.doc
- 中国知网大学生检测系统学生提交论文操作说明.docx
- 中央党校级法学理论专业硕士研究生第三学期教学计划.doc
- 中央:关税纳税筹划案例.doc
- 中央:消费税筹划案例分析.doc
- 中女性巧养生.doc
- 中国铁路的发展历程动车论坛.doc
- 中央广播电视大学数控技术专业专科.doc
- 甘肃省白银市第六中学等校联考2024-2025学年九年级上学期11月期中语文试题(含答案).docx
- 2010-2023历年浙江省杭州高级中学度高一下学期期中考试试卷(英语).docx
- 2010-2023历年浙江省杭师大附中高三上学期第一次月考化学试卷.docx
- 2010-2023历年浙江省桐乡一中高一下学期期中考试物理文科试卷(带解析).docx
- 2010-2023历年浙江省杭师大附中高三第一次月考生物试卷.docx
- 2010-2023历年浙江省杭州高级中学0910高一下学期期中试题英语.docx
- 2010-2023历年浙江省杭州高级中学高三第六次月考英语试卷(带解析).docx
- 2010-2023历年浙江省杭州高级中学高一上学期期中考试化学试卷.docx
- 2010-2023历年浙江省杭州高级中学高一上学期第一次月考政治试卷(带解析).docx
- 劳动主题班会教案(精选10篇) .pdf
文档评论(0)