- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
份汽车要闻
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking insta
您可能关注的文档
- 中药药剂学辅导全.doc
- 中药学大专业各方向教学大纲.doc
- 临夏县漫路中学家长学校活动计划.doc
- 临床助理医师辅导讲义目录.doc
- 中银国际航空行业:通用航空产业,将迎来大发展的黄金时代.doc
- 中船问卷设计终稿HU.doc
- 临床执业医师辅导讲义目录.doc
- 临潼路技术标.doc
- 丹尼斯春节促销方案doc1.doc
- 为青教师搭建成长平台[].doc
- 芯控源一级代理商AGM40P65EL SOT23 VER2.62深圳阜 康科技.pdf
- 芯控源一级代理商AGM40P150C VER2.71 (1)深圳阜 康科技.pdf
- 芯控源一级代理商AGM045P10D VER2.71深圳阜 康科技.pdf
- 芯控源一级代理商AGM614MN VER2.65深圳阜 康科技.pdf
- 2024资产移交合同范本.docx
- 2024房屋租赁合同法律规定「详细版」.docx
- 2024租房合同范本下载租房合同.docx
- 2024劳动合同不到期怎么赔偿.docx
- 2024房屋室内装修合同格式.docx
- 2024承揽合同项下因台风发生的损失如何承担——A酒店有限公司与B家具有限公司承揽合同争议仲裁案.docx
文档评论(0)