- 1、本文档共38页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
企事业单位新贺词
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 中药学大专业各方向教学大纲.doc
- 临夏县漫路中学家长学校活动计划.doc
- 临床助理医师辅导讲义目录.doc
- 中银国际航空行业:通用航空产业,将迎来大发展的黄金时代.doc
- 中船问卷设计终稿HU.doc
- 临床执业医师辅导讲义目录.doc
- 临潼路技术标.doc
- 丹尼斯春节促销方案doc1.doc
- 为青教师搭建成长平台[].doc
- 主副厂房验收鉴定书修改.doc
- 鲁科版高中化学选择性必修1化学反应原理课后习题 第3章测评.doc
- 人教版高考化学一轮复习课后习题 第九章 有机化学基础 热点专项练15 多官能团有机化合物的结构与性质 (3).doc
- 人教版高考化学一轮复习课后习题 第三章 金属及其化合物 热点专项练2 高考常考的铁及其化合物 (6).doc
- 鲁科版高考化学一轮复习课后习题 第二章 课时规范练10.doc
- 2024年银行招聘之银行招聘综合知识考试题库 .pdf
- 2024年黑龙江省大学生禁毒知识应知应会网络竞赛题及答案 .pdf
- 2024年贵州省中考英语真题(其他市、州卷)(原卷版) .pdf
- 2024年黑龙江省禁毒知识答题活动题及答案 .pdf
- 仓库安全管理制度培训.pptx
- 维护国家安全教案.pptx
文档评论(0)