- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
健康注意事项女士护肤博客
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 交通运输专业铁路运输方向.doc
- 产万吨对二甲苯设计.doc
- 产业链中的价值创造和分配最后稿.doc
- 产业转移与区域产业结构调整分析实践分.docx
- 亚太地区个城市标志形象分析.doc
- 交院周策划案.doc
- 五色令目盲彩墨炫人生~赏读当代艺术家左锋义彩墨展有感.docx
- 产品设计师岗位说明书正本.doc
- 产品外观检验标准五金件,印刷电路板,喷粉,油漆,丝印[].doc
- 产品外观检验标准书加严版.doc
- 2023-2024学年小学一年级上语文课堂练习题附答案详解(实用) .pdf
- 2024-2025学年初中历史与社会(人文地理)七年级下册人教版(新课程标准)教学设计合集.docx
- 安全的教师演讲稿.pptx
- 2023-2024学年小学一年级上语文学期复习题和答案(培优) .pdf
- 2023-2024学年小学一年级上语文单元测试题附答案(能力提升) .pdf
- 2023-2024学年广东广州新人教版(一起)六年级上英语期末试卷(含解析.pdf
- 2023-2024学年山西省太原市九年级上学期数学质量检测试题(含答案).pdf
- 2023-2024学年山西省忻州市八年级下学期期末数学试卷及参考答案.pdf
- 2023-2024学年山东省青岛市胶州实验中考试题猜想英语试卷含答案.pdf
- 七年级历史总结.pptx
文档评论(0)