- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
光伏发电功率预测方法研究的综述 成品
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 产品设计师岗位说明书正本.doc
- 产品外观检验标准五金件,印刷电路板,喷粉,油漆,丝印[].doc
- 产品外观检验标准书加严版.doc
- 亲子夏令营约稿.doc
- 产品手册文字含英文改.doc
- 产品介绍版中英文.doc
- 产品策略下.doc
- 人保寿险境外紧急救援医疗保险条款.doc
- 人床上的谎言及谎言背后.doc
- 人力一级履历表详细范文.doc
- 大数据场景应用解决方案.pptx
- 2024-2025学年小学音乐二年级下册花城版(2024)教学设计合集.docx
- 大数据场景应用解决方案课件.pptx
- 专题6.12手拉手与相似综合大题专项提升训练(重难点培优)2022-2023学年九年级数学下册尖子生培优题典(原卷版)【苏科版】.pdf
- 2024-2025学年小学英语六年级上册冀教版(三起)(2024)教学设计合集.docx
- 大数据城市网络安全指数报告.pptx
- 专题6.13相似与动点综合问题大题专项提升训练(重难点培优)-2022-2023学年九年级数学下册尖子生培优题典(解析版)【苏科版】.pdf
- 2024-2025学年小学音乐六年级下册苏少版(2024)教学设计合集.docx
- 专题6.13相似与动点综合问题大题专项提升训练(重难点培优)-2022-2023学年九年级数学下册尖子生培优题典(原卷版)【苏科版】.pdf
- 2024-2025学年小学英语三年级上册(2024)冀教版(三起)(2024)教学设计合集.docx
文档评论(0)