- 1、本文档共142页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公文写作范例 人民时评申论必备
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 住读部三八妇女节活动简报.doc
- 住院护士操作说明.doc
- 住客房空房夜床服务标准GE.doc
- 余姚市马渚开元小学百校庆.doc
- 你手上有多少个螺,决定你的性格.doc
- 作物所技术标农科院.doc
- 作业光纤传感器原理及应用 原版.docx
- 作业指导书驻地标准化建设作业指导书.doc
- 你一定能用到的个生活小妙招.doc
- 使用说明书中文版 中英对照.doc
- 河南省安阳市林州市长安路小学2022-2023学年四年级上学期期中英语试卷(含答案,无听力原文,无听力音频).doc
- 6.《秋天的雨》课件(共48张PPT).pptx
- 22 为中华之崛起而读书 课件(共27张PPT).pptx
- 10爬山虎的脚 课件(共27张PPT).pptx
- 5一个豆荚里的五粒豆 第二课时 课件(共22张PPT).pptx
- 2024-2025学年统编版八年级道德与法治下册期末学情评估练习卷(含答案).doc
- 安徽省颍上第一中学等五校2025届高三上学期11月期中联考物理试卷(含解析).docx
- 河南省驻马店市新蔡县第一高级中学2025届高三上学期11月月考历史试卷(含答案).docx
- 18牛和鹅 课件(共28张PPT).pptx
- 22.《读不完的大书》课件(共38张PPT).pptx
文档评论(0)