- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 保险合同及分类.doc
- 保险学基于网络答案六.doc
- 保险学复习点.doc
- 保险学小抄精炼总结.doc
- 保险学概论教学大纲.doc
- 保险学第十三周保险经营效益.doc
- 保险学重点非保险专业.doc
- 保险学简要笔记.doc
- 保险实务单元教案.doc
- 保险开门红主持稿.doc
- 小公司年会创意节目活动方案.pptx
- 暑假安全教育心得体会模板.pptx
- 残疾人帮扶活动方案.pptx
- 二级建筑师报名流程.pptx
- 2024社区爱国卫生月宣传活动方案.pptx
- 湖南省多校联考2024-2025学年高三上学期11月月考政治试题含答案.pdf
- 河南省部分重点高中青桐鸣大联考2024-2025学年高三上学期11月月考历史试题含答案.pdf
- 广东省汕头市金山中学2024-2025学年高二上学期期中考试物理试题(含答案).pdf
- 广东省汕头市金山中学2024-2025学年高二上学期期中考试含部分答案(8科试卷).pdf
- 湖北省荆州市沙市中学2024-2025学年高三上学期11月月考含答案(8科试卷).pdf
文档评论(0)