- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
农大 统计学原理在线作业C 满分
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 党员公开承诺书[].doc
- 光明花园二期营销策划方案原创.doc
- 党员公开承诺书范本[].doc
- 免费版u发版说明.doc
- 党性分析材料页.doc
- 党代会换届.doc
- 党风廉政建设和反腐败斗争的形势和任务分.doc
- 党员学习笔记月月.doc
- 入党积极分子写思想汇报须知内含篇思想汇报范文.docx
- 免费个人简历模板全集可直接下载使用还有更多彩色模版word版.doc
- Unit 1 Keeping Healthy Lesson 2 课件 2-经典通用.ppt
- Unit 1 Playtime Lesson 1 同步练习1-经典通用.doc
- 2019电力用户农排费控采集系统第7部分农排费控终端信息交换安全技术规范.pdf
- 2024用电信息采集系统技术规范第2部分:集中器和采集器.docx
- 2019电力用户农排费控采集系统第3部分农排费控智能电能表型式规范.pdf
- 2019电力用户农排费控采集系统第4部分农排费控智能电能表信息交换安全技术规范.pdf
- 2019电力用户农排费控采集系统第5部分农排费控终端技术规范.docx
- 2019电力用户农排费控采集系统第3部分农排费控智能电能表型式规范.docx
- 2019电力用户农排费控采集系统第2部分农排费控智能电能表功能规范.pdf
- 2020水利工程建设标准强制性条文实施指南第2部分水利工程施工.docx
文档评论(0)