- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
几套音画边框代码
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 全国建筑装饰行业创新成果公示.doc
- 全印展首届快印强品牌评选活动印联传媒第期“快印店店长精英”教练营.doc
- 全国招收机械类研究生的院校有多.doc
- 全国房价排行榜.docx
- 全国星级饭店数量统计及出租率.doc
- 全国给排水联名维权书第稿.doc
- 全国计算机二级数据结构与算法知识点.docx
- 全十同行 潮涌不息 十周庆策划案.doc
- 全国技能大赛组队参赛说明.doc
- 全新苏少版小学音乐三级下册.doc
- 2021年四川省雅安市公开招聘警务辅助人员辅警笔试精编自考题1卷含答案.docx
- 2024年云南省昭通市公开招聘警务辅助人员辅警笔试自考练习卷二含答案.docx
- 2021年甘肃省天水市公开招聘警务辅助人员辅警笔试摸底备战测试3卷含答案.docx
- 2024年山西省朔州市公开招聘警务辅助人员辅警笔试摸底测试1卷含答案.docx
- 2024年内蒙古自治区阿拉善盟公开招聘警务辅助人员辅警笔试摸底测试2卷含答案.docx
- 2024年广东省梅州市公开招聘警务辅助人员辅警笔试摸底测试2卷含答案.docx
- 2021年河北省秦皇岛市公开招聘警务辅助人员辅警笔试自考练习卷二含答案.docx
- 2021年辽宁省抚顺市公开招聘警务辅助人员辅警笔试摸底测试1卷含答案.docx
- 2021年吉林省辽源市公开招聘警务辅助人员辅警笔试冲刺自测题一卷含答案.docx
- 2023年山东省济南市公开招聘警务辅助人员辅警笔试经典练习卷B含答案.docx
文档评论(0)