- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
分享:整形达人的小脸秘诀docx
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installati
您可能关注的文档
- 全球采购模式对家居零售业的影响以宜家IKEA为例 必威体育精装版.doc
- 全球各国高铁发展进化史.doc
- 全自动喷码机DT.docx
- 全国预防肿瘤宣传活动方案 doc.doc
- 全国各地特色小吃总结最全.doc
- 全球十大“高富帅”酒店.docx
- 八级上册思想品德复习提纲.doc
- 八级上册练习册里的词组重要句子.doc
- 八级上地理期末总复习提纲.doc
- 八级地理上册《中国的河流》教案 湘教版.doc
- 鼎帷咨询-华为汽车发展战略研究报告-84页.docx
- 人工智能行业专题:IDC建设周期在即,关注国产算力机遇-国信证券.docx
- 源力增长:2024中国餐饮企业穿越周期之道研究报告.docx
- 房地产行业土地增值税合规报告(2025).pdf
- 人工智能行业深度研究报告.docx
- 字节AI深度:战略布局、产业趋势、产业链及相关公司深度梳理(2024).docx
- 【凯爱瑞】2024捕捉华夏民族珍味-咸味主食与咸味零食创新机遇报告.docx
- AIGC之AI绘画行业发展研究报告2023.docx
- 房地产 -深圳甲级写字楼市场季度报告 2024年第二季度.pdf
- 房地产 -深圳甲级写字楼市场季度报告 2024年第三季度.pdf
文档评论(0)