- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初等教育系届毕业论文设计指导方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 公文写作范例 人民时评申论必备.doc
- 六《美化主页方法多》二小黎锡辉.doc
- 六,学科分类与代码代码.doc
- 公关接待魅力与礼仪风范修炼王雅波.doc
- 六侦查文书.doc
- 公选党政领导干部.doc
- 公需科目:创新能力建设专业技术人员创新案例.doc
- 六级下册思想品德教案全册.doc
- 六级最重要的多个选项高频词汇.doc
- 六种感冒用药说明书.doc
- 房地产管理方法PPT购买.pptx
- 癌症患者的心理护理PPT教案.pptx
- 精麻药品管理条例.pptx
- 浙江省宁波市2023-2024学年高二上学期1月期末考试物理试题(含答案)3.pdf
- 部编版2023-2024学年五年级上学期语文期末试卷(含答案)2.docx
- 浙江省杭州市2023-2024学年高二上学期1月期末考试物理试题(含答案)3.docx
- 广东省广州市番禺区2023-2024学年七年级上学期语文期末试卷(含答案).docx
- 广东省广州市番禺区2023-2024学年七年级上学期语文期末试卷(含答案).pdf
- 浙江省杭州市2023-2024学年高二上学期1月期末考试物理试题(含答案)3.pdf
- 浙江省杭州市2023-2024学年高二上学期1月期末考试物理试题(含答案)4.pdf
文档评论(0)