- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
前置审批改为后置审批目录四批共项
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 28
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 六挡更好用 四款自主品牌AT车型推荐.doc
- 六级核心词汇美化打印版修改.doc
- 兰大《混凝结构》春平时作业.doc
- 兰州大学暑期社会实践指导手册.doc
- 兰州市会展发展现状及对策研究修改稿.doc
- 六十五周国庆晚会主持词.doc
- 兰大《混凝结构》春平时作业1.doc
- 关乎女性健康的个最精彩瞬间.docx
- 兰大《保险原理》春平时作业.doc
- 关于ka渠道经理终端.doc
- 2019时代楷模杨春先进事迹感想3篇_扫黑英雄杨春的热血一生.pdf
- 2020领导干部个人年度述职报告范文4篇 .pdf
- 2022年“改进作风、狠抓落实”工作实施方案参考范文.pdf
- 2021年安全防护文明施工措施方案与2021年安全防护施工技术方案.pdf
- 2019年会议主持稿,邀请领导最后讲话-范文 (6页) .pdf
- 2021年德勤能绩廉述职报告.pdf
- 2021年高中语文 第一单元之《林黛玉进贾府 》教案 新人教版必修3.pdf
- 2023_2024学年新疆维吾尔自治区喀什地区巴楚县八年级第二学期期中历史检.pdf
- 2023年农村经济发展工作总结(真题4篇) .pdf
- 2023年共青团成立100周年宣传标语大全 .pdf
文档评论(0)