- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 医生招 教你看病时如何精明就医.doc
- 医学微生物学总结免费经典法则.doc
- 区域农业发展以东北地区为例学案学生版.doc
- 医疗器械关键词.docx
- 医疗保险学术论文评选获奖论文.doc
- 医疗废物处置厂污水处理技术研究论文终稿.doc
- 医疗保险修改后.doc
- 医疗纠纷预防与处理条例送审稿.doc
- 十七届六中全会解读new.doc
- 医学遗传学编写思路及要求[].doc
- 2022-2023学年湖北省荆门市京山市八年级上学期期中教学质量监测数学试 .pdf
- 2022- 2023学年度八年级数学上册模拟测试卷 (2336) .pdf
- 2006中级会计职称考试《财务管理》练习题及答案 .pdf
- 2021届湖北省鄂州市梁子湖区九年级12月月考化学试卷_图文 .pdf
- 2021年北师大版七年级数学上册期末考试题(含答案) .pdf
- 1分有多长(教案)2023-2024学年数学二年级下册北师大版 .pdf
- 1.2古代两河流域教学设计2024-2025学年统编版九年级历史上册.pdf
- 2021年湖南省张家界市电梯作业电梯维修保养(T1)真题及答案 .pdf
- 2014-2015学年第二学期八年级物理教学计划沪粤版 .pdf
- 2021-2022学年人教版数学三年级上册第四单元测试卷A卷(精编) .pdf
文档评论(0)