- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
周庆晚上活动方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 十五例余字新贺词.doc
- 十大商标经典案例.doc
- 十二五节能减排综合性指导方案和火力发电厂大气污染物排放标准宣贯.doc
- 北京机房网聚无限兆维机房介绍.doc
- 十大营销创新谋略.doc
- 升格作文的语言.doc
- 十大城市后置家最“潮”的地.doc
- 半导体产业的十巨变.doc
- 华东师范大学级MBA开学典礼隆重举行.doc
- 华为决策体系组织结构.docx
- 科技教育在初中物理课中的应用教学研究课题报告.docx
- 高中生心理健康教育的有效实施策略教学研究课题报告.docx
- 初中道德与法治课程的实施效果评估教学研究课题报告.docx
- 课外辅导对初高中生学业成就的影响教学研究课题报告.docx
- 高中化学难点突破的教学设计研究教学研究课题报告.docx
- 教师课堂提问技巧对学生思维的促进教学研究开题报告教学研究课题报告.docx
- 心理剧教学法在小学教育中的实践研究教学研究课题报告.docx
- 小学体育游戏对学生身心发展的作用教学研究课题报告.docx
- 以体育活动促进小学生合作意识教学研究课题报告.docx
- 教育公平的实现路径及实践研究教学研究开题报告教学研究课题报告.docx
文档评论(0)