- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
品牌女装知识积累女装知识攻略时尚女装知识积累
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 华师网院《资产评估》作业.doc
- 华茂钢构吊装方案.doc
- 华贸中心新光天地.doc
- 华夏信用卡商城周庆典活动策划方案.doc
- 华县永安城项目可研.doc
- 卓越餐厅成功的个秘诀书稿介绍与摘要.doc
- 协会周庆活动方案书.doc
- 单元二封建大一统时期秦汉.doc
- 单元整理复习提纲 【秋】.doc
- 单屏红外框多点触控系统1.doc
- 2024-2030年中国凝胶成像仪市场供需平衡现状与投资前景研究研究报告.docx
- 2024-2030年中国农村商业银行行业市场深度调研及发展趋势与投资前景研究报告.docx
- 2024-2030年中国农用5-氨基乙酰丙酸(5-ALA)市场深度调查与发展趋势研究研究报告.docx
- 2024-2030年中国冠状动脉切割球囊行业市场发展趋势与前景展望战略研究报告.docx
- 2024-2030年中国冶金级金属硅行业风险评估及前景经营效益可行性研究报告.docx
- 2024-2030年中国冲击式水轮机行业市场发展趋势与前景展望战略研究报告.docx
- 2024-2030年中国净洗剂市场发展分析及市场趋势与投资方向研究报告.docx
- 2024-2030年中国净水器行业销售态势与竞争策略分析报告.docx
- 2024-2030年中国冷链物流行业市场发展分析及发展趋势与投资前景研究报告.docx
- 2024-2030年中国创业贷款行业市场深度发展趋势与前景展望战略研究报告.docx
文档评论(0)