- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
四则混合运算及简便计算
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 南开秋学期《饭店案例研究》在线作业.doc
- 南昌航空大学 论文.doc
- 南通市现代服务业提速发展行动计划.doc
- 南京美式装修注意事项及技巧.doc
- 单相防爆插头和防爆插座插头价格1.docx
- 单道次渐进成形锥形件壁厚稳定区域的研究.doc
- 卫生监督所目标责任书.doc
- 南开秋学期《马克思主义哲学原理》在线作业.docx
- 卫生资格初级药士相关专业知识.doc
- 卒中病历模板.doc
- 2024-2025学年高中地理必修 第一册湘教版(2019)教学设计合集.docx
- 2024-2025学年小学劳动三年级下册粤教版(主编:徐长发)教学设计合集.docx
- 2024-2025学年初中音乐七年级下册沪教版教学设计合集.docx
- 2024-2025学年高中地理必修1人教版教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)四年级下册电子工业版(宁夏)教学设计合集.docx
- 2024-2025学年高中英语必修 第三册北师大版(2019)教学设计合集.docx
- 2024-2025学年高中地理必修3人教版教学设计合集.docx
- 2024-2025学年高中生物学必修2 遗传与进化人教版(2019)教学设计合集.docx
- 2024-2025学年小学劳动五年级下册人民版《劳动》(2022)教学设计合集.docx
- 2024-2025学年初中信息技术(信息科技)第二册电子工业社版(2022)教学设计合集.docx
文档评论(0)