- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土地补偿款如何征税[]
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 品牌家纺床上用品知识四.doc
- 品德与社会五级下册期末复习资料.doc
- 品管七大手法之因果图鱼刺图.doc
- 品管七大手法之柏拉图排列图.doc
- 品管七大手法讲义ASKEY.doc
- 品牌女装知识积累女装知识攻略时尚女装知识积累.doc
- 品牌名称汽车.doc
- 品质漫谈厂商调查与评估.doc
- 品质变异反馈与处理程序.doc
- 品质漫谈设计品质.doc
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)