- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大富翁嘉华活动策划书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 地下室挖土案.doc
- 地理上复习.doc
- 地产策划方案几个经典方案.doc
- 地区凝气式火力发电厂电气部分设计secret.doc
- 地理分界秦岭淮河.doc
- 地方税费征收政策一览表.doc
- 地漏卫生间防水技术交底.doc
- 地理东莞市届高二上学期期末质检.doc
- 地籍管名词解释及简答论述.doc
- 地理初二上册.doc
- 南京市2024—2025学年度第一学期期中学情调研测试高二数学答案.docx
- 期中模拟测试卷01(原卷版).docx
- 2025届高三上学期第二次诊断考试(11月)数学试题.docx
- 第6课 从隋唐盛世到五代十国(课件)高一历史课件(中外历史纲要上册).pptx
- 习作:我的植物朋友(课件)三年级语文下册(统编版五四制).pptx
- 第一单元第四节 计算机的常规管理(第一课时)甘教版(2022)初中信息技术七年级上册.pptx
- 4.1 家的意味 七年级道德与法治上册(统编版2024).pptx
- 1.1 奏响中学序曲(课件)-七年级上册道德与法治(统编版2024).pptx
- 4.1 家的意味-道德与法治七年级上册课件(统编版2024).pptx
- 14 应有格物致知精神-八年级语文下册.pptx
文档评论(0)