- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大胆探索 主动作为上半发言
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 地质学基础知识doc.doc
- 地籍调查方法.doc
- 城市化产业结构变动与城乡收入差距动态分析修改稿.doc
- 垃圾随手来清理.doc
- 地理必修知识点填空期末复习.doc
- 城市综合体开发峰会实录.docx
- 城市形象传播文献综述.doc
- 城市观点论坛长沙行基本资料.doc
- 城市污水再生利用政策.doc
- 基于JEE技术的新闻发布系统的设计与实现.doc
- 广东省深圳市龙岗区德琳学校初中部2022-2023学年七年级上学期期中考试英语试题(原卷版+解析).docx
- 广东省珠海市第四中学、立才学校、梅华中学2022-2023学年七年级上学期期中质量检测英语试题(原卷版+解析).docx
- 教科版2024-2025学年六年级科学上册第一单元第4课时《生物细胞》同步练习(含答案).docx
- 牛津沪教版七年级英语上册单元速记•巧练 Unit 7 【单元测试 · 提高卷】.docx
- 牛津沪教版七年级英语上册单元速记•巧练 Unit 5【单元测试 · 基础卷】.docx
- 广东省深圳市南山区太子湾学校2022-2023学年七年级上学期期中考试英语试题(原卷版+解析).docx
- 广东省深圳市南山第二外国语学校(集团)2022-2023学年七年级上学期期中考试英语试题(含听力)(原卷版+解析).docx
- 牛津沪教版七年级英语上册单元速记•巧练 2023-2024学年七年级上学期期末英语全真模拟卷(深圳适用02).docx
- 广东省阳江市江城区2022-2023学年七年级上学期期中考试英语试题(原卷版+解析).docx
- 广东省梅州市梅县区宪梓中学2022-2023学年七年级上学期期中英语试题(原卷版+解析).docx
文档评论(0)