- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 外语通操作系统升级帮助.doc
- 外观检验标准玻璃件.doc
- 多元化内部融资的其他模式.doc
- 多元化经营论文.doc
- 外贸单证单据样本.doc
- 外贸服装专业术语[].doc
- 多接口光收发机一纤通说明书.doc
- 多调节水库兴利库容计算方法.doc
- 大众与宝马的劳斯莱斯之争.doc
- 大兴汽车自驾游活动策划方案.doc
- 人教版数学六年级上册 第一单元 第5课时 分数乘小数.pptx
- 人教版数学六年级上册 第四单元 第3课时 比的应用.pptx
- 人教版数学六年级上册 第五单元 第5课时 圆的面积-2.pptx
- 人教版数学六年级上册 第一单元 第7课时 解决问题-1.pptx
- 人教版数学六年级下册 第二单元 第4课时 利率.pptx
- 人教版数学六年级上册 第一单元 第8课时 解决问题-2.pptx
- 人教版数学六年级下册 第五单元 第2课时 鸽巢问题的一般形式.pptx
- 人教版数学六年级下册 第四单元 整理和复习.pptx
- 人教版数学六年级上册 第一单元 第3课时 分数乘分数-1.pptx
- 人教版数学六年级下册 第六单元复习第2课时 可能性.pptx
文档评论(0)