- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
学生手册无封面
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 大兴汽车自驾游活动策划方案.doc
- 大众医学总目录.doc
- 多媒体技术应用模拟卷十四.doc
- 大专病理学重点总结doc.doc
- 大兴安岭城镇体系文本.doc
- 大地财产一切险条款中英文.doc
- 大型公关营销活动的成功典范doc.doc
- 大中型电机综合厂房监理实施细则1.doc
- 大功率电容和防爆启动电容CBB价格.docx
- 大型消夏青联谊会.doc
- 2025年江苏高中物理学业水平合格性考试试卷试题(含答案解析).pdf
- 河南省周口市英语高二上学期期末试卷与参考答案(2024年).pdf
- 上教版数学高考试卷及解答参考(2024年).pdf
- 研究生考试考研计算机学科专业基础(408)试题及解答参考(2024年).pdf
- 研究生考试考研法律硕士专业基础(法学397)试卷及解答参考.pdf
- 软件资格考试计算机辅助设计师(基础知识、应用技术)合卷(中级)试题及答案指导(2024年).pdf
- 陕西省榆林市榆林联考2024-2025学年高二上学期11月期中英语试题含答案.pdf
- 残雪作品的海外英译及其接受研究.pdf
- 煤矿井下带式输送机智能巡检机器人系统设计.pdf
- 2024年牛津版初一上学期期末英语试卷与参考答案.pdf
文档评论(0)