- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 威博设计吧 VRay材质教程.doc
- 如何解决OO的“最后一公里”,这五大模式为你支招.docx
- 婚礼摄像方案附婚礼注意事项和贺词.doc
- 如何购买变倍望远镜 进口品牌变倍望远镜选购指.doc
- 媒体健康时报活动.docx
- 婚礼筹办方案改.doc
- 孔子的当代解读与世界意义上.doc
- 孙海运同志在城前镇教师节庆祝大会上的讲话.doc
- 孙鹏谈谈毕业论文设计F.doc
- 学习部·社交礼仪.doc
- 2024年全国总工会所属事业单位招考聘用笔试历年典型考点(频考点试卷)解题思路附带答案详解.docx
- 2024至2030年中国粉防己数据监测研究报告.docx
- 2024至2030年商业用高效率条码标签印表机项目投资价值分析报告.docx
- 2024至2030年中国LED嵌入灯数据监测研究报告.docx
- 2024至2030年中国花园铝椅子数据监测研究报告.docx
- 2024至2030年异型铁表壳项目投资价值分析报告.docx
- 2024至2030年遥控特技蚱蜢项目投资价值分析报告.docx
- 西藏2024年10月西藏日喀则市市直机关事业单位遴选公务员35人国家公务员考试消息笔试历年典型考点(.docx
- 2024至2030年液位变送器项目投资价值分析报告.docx
- EDA软件:Cadence Virtuoso二次开发_(2).CadenceVirtuoso基础知识.docx
文档评论(0)