- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
岳麓必修提纲
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 学生选读专业书目.doc
- 学第一学期细胞生物学B卷.doc
- 宁夏回族自区 花儿.doc
- 学第一学期细胞生物学B卷1.doc
- 学论文修改一周目.doc
- 宁波大学甲A篮球联赛策划书.doc
- 孩之宝玩具全标准.doc
- 宁波大学 商学院毕业论文《星巴克品牌竞争力研究》.doc
- 学高中地理 以畜牧业为主的农业地域类型同步学案 新人教版必修.doc
- 宁夏水资源供求对策研究十一五最终成果.doc
- 【机电实务】王建波 习题精析班教案 13-习题精析(十三).docx
- 【建筑实务】梁毛 教材精讲班课件 64-第7章-工程招标投标与合同管理(一).pptx
- 【建筑实务】梁毛 教材精讲班课件 49-第3章-3.6-装饰装修工程施工(二).pptx
- 【建筑实务】梁毛 教材精讲班 36-第3章-3.4-主体结构工程施工(二).pdf
- 【机电实务】王建波 课件 01-真题解析班(一).pptx
- 【建筑实务】梁毛 冲刺串讲班课件 04-第3章-建筑工程施工技术(二).pptx
- 【机电实务】王建波 课件 04-真题解析班(四).pptx
- 【建筑实务】梁毛 备考导学班课件 02-备考预习(二).pptx
- 【建筑实务】梁毛 教材精讲班课件 20-第2章-2.2-装饰装修工程材料.pptx
- 【建筑实务】梁毛 教材精讲班课件 75-第8章-施工进度管理(四).pptx
文档评论(0)