- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
崂山矿泉水资料
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by serie
您可能关注的文档
- 安徽电信翼支付.doc
- 安保计划雅培嘉兴项目.doc
- 安徽省杰出青科学基金申请书必威体育精装版版.doc
- 安徽省医疗服务价格中医.doc
- 安利中国营销案例分析.doc
- 安徽省蚌埠市中小学教师远程全员.doc
- 宅院A区临高铁商业定位及推售建议.doc
- 安徽省公共建筑节能设计标准版.doc
- 宋其玉情况简介.doc
- 安可信气体 AEC 使用说明书.doc
- 广东省广州市增城区2023-2024学年九年级上学期期末道德与法治试题(答案).doc
- 广东省广州市2021-2022学年九年级上学期期末模拟历史试题(含答案).docx
- 广东省广州市天河区暨南大学附属实验学校2022-2023学年九年级上学期期末历史试题.doc
- 广州市南沙区2023—2024学年第一学期九年级历史期末教学质量监测模拟试卷.doc
- 广东省广州市天河区暨南大学附属实验学校2022-2023学年九年级上学期期末历史试题(答案).doc
- 在全市县区委书记第五次工作座谈会上的讲话.docx
- 3篇中央政法工作会议发言材料汇编.docx
- 5篇贵州省庆祝第二十个中国记者节座谈会经验交流发言材料汇编.docx
- 在全市人大工作座谈会上的讲话.docx
- 在全市人大系统改革创新工作交流会上的讲话.docx
文档评论(0)