- 1、本文档共33页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
影响中国营销进程的位风云人物DOC 页
HYPERLINK 特别惠 \o 网购新模式,就选特别惠(),每天一团,精彩无限特别惠团购网(高品质、超低价) HYPERLINK
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one,
您可能关注的文档
- 届电子商务专业毕业设计指导方案.doc
- 山东名牌产品评价评分指南.doc
- 山东省固定源大气颗粒物综合排放标准DB.doc
- 山东省昌乐外国语学校邵秀芹的第四届全国“教学中的互联网应用”教案评选《师爱助我成长我爱我师》.doc
- 山东省东营市城市居民服务性消费情况.doc
- 层电梯的plc设计.doc
- 山东省区域性大气污染物综合排放标准DB.doc
- 山东省枣庄市第四十二中学八级政治上册《做个聪明的消费者》教案新人教版.doc
- 山洪灾害临界雨量分析计算gao.doc
- 山东省价格鉴定案卷文书格式示范文本.doc
- 2016-2017学年高中生物第二单元生态工程与生物安全第1章第2节我国的生态工程教案中图版选修3.doc
- 2022-2023学年小升初英语易错点专练06完形填空15篇(广州教科版专版含答案)2.docx
- 期中专项四年级英语下册(含答案)3.docx
- 期末卷(二)(含答案解析)-2022-2023学年高二历史期中期末复习备考必刷题(选择性必修一国家制度与社会治理).docx
- 第4课欧姆定律的应用第一讲欧姆定律实验探究(原卷版).docx
- Unit1限制性定语从句语法讲义人教版高一英语学生版213.docx
- 2023年宁波市初中毕业升学文化考试科学模拟卷(八).docx
- 5.3细胞呼吸的原理和应用课件高一上学期生物人教版必修12.pptx
- 高中政治更好发挥政府作用教学设计.docx
- 体悟民间故事中的幸福--五上《中国民间故事》导读课.docx
文档评论(0)