- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 建阳方案钢结构吊装方案.doc
- 张玉讲师《团队建设与执行力提升训练营》.doc
- 当代华人豪门家族盘点组图.doc
- 当代知识分子的楷模马祖光.doc
- 当代美文解读[].doc
- 建行网银结汇设置和操作.doc
- 当代非物质文化遗产保护政策研究综述1.doc
- 当代美文解读篇.doc
- 当前国家鼓励发展的环保产业设备产品目录.doc
- 当前农村基教育的现状与对策.doc
- 二年级群文阅读《有趣的问答歌》逐字稿.docx
- 2022员工职位计划文本3篇 .pdf
- 2019年中小学安全知识竞赛试题及答案(精华版) .pdf
- 2020-2021学年(统编版)语文三年级下册课外阅读练习及答案(8篇).pdf
- 2018-2019二学期期末八年级数学试题 .pdf
- 2020级模具设计与制造专业(4年制技师大专)实施性人才培养方案 .pdf
- 2020年四年级数学下册四单元考试卷及答案(二篇) .pdf
- 2020学年七年级第二学期期末监测语文试题含解析 .pdf
- 2022北师大版四年级上册数学期末测试卷附完整答案(典优) .pdf
- 2021-2022学年榆树市泗河中学七年级数学上册1.1生活中的图形期末试卷wo.pdf
文档评论(0)