- 1、本文档共4页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 手册DES系列产品介绍部分.doc
- 批高起专毕业论文范例.doc
- 扰动下对稳态误差及减小稳态误差的措施第讲.doc
- 托福听力重点场景词汇之家具类.docx
- 技术交底消防弱电系统安装.doc
- 托福阅读机经背景文化类:聚餐为何在中午.docx
- 技术交底陶瓷地面砖.doc
- 技能抽测实训总结吴正杰.doc
- 托福写作锦囊妙计应用则.docx
- 技术协议★★★★★★★★★.doc
- 《生态修复工程中植被恢复技术的生态恢复模式评估指标体系构建》教学研究课题报告.docx
- 高中语文“当代文化参与”与课外阅读拓展的互动研究教学研究课题报告.docx
- 鸦片战争介绍课件.pptx
- 2025年中国电动单轫行车行业投资前景及策略咨询研究报告.docx
- 电网电力系统笔试题九国网试题.pdf
- 《智能家居系统中的物联网技术对智能家居设备安全性、可靠性与用户体验的影响》教学研究课题报告.docx
- 2025年中国文具塑件数据监测报告.docx
- 2024年河北省石家庄市正定县诸福屯镇招聘社区工作者真题附答案详解.docx
- 2024年河北省石家庄市正定县诸福屯镇招聘社区工作者真题及答案详解1套.docx
- 2024年河北省石家庄市深泽县留村乡招聘社区工作者真题参考答案详解.docx
文档评论(0)