- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 批高起专毕业论文范例.doc
- 扰动下对稳态误差及减小稳态误差的措施第讲.doc
- 托福听力重点场景词汇之家具类.docx
- 技术交底消防弱电系统安装.doc
- 托福阅读机经背景文化类:聚餐为何在中午.docx
- 技术交底陶瓷地面砖.doc
- 技能抽测实训总结吴正杰.doc
- 托福写作锦囊妙计应用则.docx
- 技术协议★★★★★★★★★.doc
- 把握新机遇 实现新跨越教师节镇长讲话稿.doc
- 精品-广州市越秀区中小学教师招聘考试试题及答案2022.pdf
- 杭州低碳科技馆景观照明亮化施工组织方案(DOC) .pdf
- 精品-电影《长津湖之水门桥》观后感450字(真题12).pdf
- 监控工作总结(精选12篇).pdf
- 汽车行业人形机器人系列专题之丝杠:高壁垒精密机械件,国产替空间广阔-国信证券.pptx
- 军贸,统筹管理,国防工业“量价利”向上突破的必由之路-广发证券50.pdf
- 智慧人力,引领未来-2024年生成式AI赋能人力资源管理研究报告.pdf
- ESG跨境:全球电商平台详解.pptx
- 浙江省温州市平阳县2023-2024学年四年级上学期语文期末考试试卷.pdf
- 山东省德州市陵城区2022-2023学年五年级上学期数学期末考试试卷.docx
文档评论(0)