- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 旅游同业答谢联谊会串词.doc
- 旅游资源开发复习大纲学生用.doc
- 无公害畜产品产地认定与产品认证申请书新版.doc
- 方案篇蒙氏教具M.doc
- 旅行登山鞋的秘密如何选择户外鞋.docx
- 无线电台站的呼号指配审批办事指南.doc
- 无缝管【无缝管厂家】.docx
- 无线监控解决方案ITS.doc
- 无线远程监控说明.doc
- 日化专营店如何提高赢利能力.doc
- 部编版八年级上册历史复习第一单元中国开始沦为半殖民地半封建社会训练题.docx
- 2024_2025学年高中历史第三单元资产阶级政治家第10课革命的先行者孙中山2教学教案岳麓版选修4.doc
- 2025届高考历史统考一轮复习课后限时集训4专制集权的不断加强含解析岳麓版.doc
- 2025届高考数学试卷专项练习12三角函数与解三角形含解析.doc
- 2025届高考生物一轮复习专题重组卷第一部分单元检测卷十生物技术实践含解析.doc
- 2025届高考政治一轮复习素养测评二十六文化创新含解析.doc
- 2024_2025学年新教材高中政治第二单元人民当家作主6.2民族区域自治制度教案部编版必修3.docx
- 2024_2025学年新教材高中地理第四章区际联系与区域协调发展4国际合作教案新人教版选择性必修2.doc
- 2025届高考数学第二次模拟试卷三理含解析.doc
- 2025版高考英语一轮复习必修3Module6OldandNew学案含解析外研版1.doc
文档评论(0)