- 1、本文档共34页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
未成人自救自护知识讲座
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 普通高中地理教学大纲很精准.doc
- 景上家居一周庆典活动方案 doc.doc
- 普通外科专业知识内部押密卷.doc
- 晶体类型与质.doc
- 普通地质学黄定华精简版.doc
- 春夏女鞋趋势预测重点款式.docx
- 景观生态学城市建设的指导.doc
- 景逸LV汽上市活动经销商执行策划案.doc
- 景观标准化研究绿化硬质篇.docx
- 暑期师德师风心得.doc
- 2024年公务员省考之行测题库练习试卷A卷附答案 .pdf
- 2024年4月高教自考《财务管理学》试卷含解析.pdf
- 2024年【安全员-A证】模拟考试题及答案.pdf
- 2024年(必威体育精装版)国开(电大)本科《公共行政学》期末题库(含答案).pdf
- 2024年公务员(国考)之行政职业能力测验精选试题及答案二 .pdf
- 2024届贵州省普通高中高二学业水平合格性考试考前模拟全真演练物理试 完整版720893906.pdf
- 2024年人教版六年级语文上册的教学计划(3篇) .pdf
- 2024山东省成人高考专升本《教育理论》真题库汇编及答案 .pdf
- 2024年【煤炭生产经营单位(安全生产管理人员)】考试及答案 .pdf
- 2024届江苏省泰兴市实验语文八年级第二学期期末达标检测模拟试题含解析.pdf
文档评论(0)