- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
未成人思想道德
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 暑期师德师风心得.doc
- 智能社区大 李家监控方案.doc
- 曼哈顿商业高峰论坛.doc
- 暑假学生社会调查问卷表.doc
- 智达权威预测卷文综.doc
- 晋鹏山台山营销推广策略方案.docx
- 智能定时开关插座.doc
- 暑期社会实践活动申请书胡炜.doc
- 最佳商业模式林伟贤.doc
- 最受HR欢迎的简历模板应届生.doc
- 2024年证券分析与咨询服务项目投资申请报告代可行性研究报告.docx
- 2024年铬酸酐项目资金申请报告代可行性研究报告.docx
- 2024年清洁胶项目资金申请报告代可行性研究报告.docx
- 2024年肉松饼项目投资申请报告代可行性研究报告.docx
- 2024年陆上泵项目资金需求报告代可行性研究报告.docx
- 2024年未硫化复合橡胶及其制品项目资金需求报告代可行性研究报告.docx
- 2024年精密温控节能设备项目资金筹措计划书代可行性研究报告.docx
- 2024年汽车覆盖件模具项目资金筹措计划书代可行性研究报告.docx
- 宋词行书钢笔字帖.pdf
- 我的暑假生活作文三年级300字10篇.pdf
文档评论(0)