- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 必威体育精装版增值税税法.doc
- 必威体育精装版乳腺癌诊疗指南.doc
- 必威体育精装版教师节演讲稿范文篇.doc
- 必威体育精装版北京市各项社会保险缴费比例表.doc
- 必威体育精装版“一般纳税人网上抄报税”操作说明及图解.doc
- 必威体育精装版版电大纳税基础与实务缩小版完整版的.doc
- 必威体育精装版肾癌诊治指南.doc
- 必威体育精装版房屋装修流程详细版本.doc
- 必威体育精装版社会心理学论文.docx
- 必威体育精装版电动车品牌口碑指数榜 新日雅迪爱玛及绿源.doc
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
最近下载
- 公共危机案例.pdf VIP
- 3.5跨学科实践:探索厨房中的物态变化问题 +章节梳理延伸 课件 人教版(2024)物理八年级上册.pptx VIP
- 初中物理作业设计优秀案例(3篇).pdf
- 2023年急性ST段抬高型心肌梗死诊断和治疗指南.docx
- 大气的受热过程说课稿2023-2024学年高中地理湘教版(2019)必修一.docx VIP
- 外研版2023必修第一册Unit 3 Family matters重点词汇短语练习含答案.pdf
- 国家开放大学《心理学》形考任务1-4参考答案.docx VIP
- 售后转正工作总结PPT.pptx
- ISO45001品质中心第三方审核记录.doc
- 3.5+跨学科实践:探究厨房中的物态变化问题++课件-2024-2025学年物理人教版八年级上册.pptx VIP
文档评论(0)