- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
杨维良胰岛素瘤例的诊断与外科治疗
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 有关PLC通信的重点综述篇:.doc
- 月物流运行情况.doc
- 月终端活动汇总 八大车企瞄准四个方向.doc
- 有机生态型无土栽培技术1.doc
- 有线无线通信系统.doc
- 有趣鞋带系法大全图解.doc
- 服装品牌竞争力.doc
- 服务细则条有问笔答.doc
- 服装成衣产业在中国大陆通路与品牌经营之探讨龙笛服饰个案分析doc.doc
- 有效沟通与协作D.doc
- 期中押题卷(试题)-2024-2025学年数学六年级上册北师大版.docx
- 期中常考检测卷(第1-4单元 )(试题)-2024-2025学年五年级上册数学人教版.docx
- 河南省驻马店市新蔡县第一高级中学2024-2025学年高一上学期10月月考地理试题.docx
- 河南省信阳市固始县英才小学2023-2024学年四年级上学期期中数学试卷.docx
- 2025届吉林省普通中学高三上学期一模考试物理试题.docx
- 山东省青岛市六年级语文上学期期中考试真题重组卷(统编版).docx
- 福建省三明市尤溪县四校联考2024-2025学年九年级上学期月考物理试卷(10月份) .docx
- 少数民族介绍主题班会-傣族课件.pptx
- 山东省菏泽市鄄城县郑营镇2024-2025学年三年级上学期10月月考语文试卷.docx
- 期末(试题)-2024-2025学年北师大版(三起)(2024)英语三年级上册.docx
文档评论(0)