- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
杭电建校周校庆公关活动策划书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 有线无线通信系统.doc
- 有趣鞋带系法大全图解.doc
- 服装品牌竞争力.doc
- 服务细则条有问笔答.doc
- 服装成衣产业在中国大陆通路与品牌经营之探讨龙笛服饰个案分析doc.doc
- 有效沟通与协作D.doc
- 有限元分析ANSYS从入门到实战.doc
- 服装标识知识介绍[].doc
- 服装设计二教案.doc
- 望江教育信息第期.doc
- [南京]江苏南京师范大学物理科学与技术学院招聘非事业编制本科生教务员笔试历年典型考题及解题思路分析附.docx
- [十堰]2024年湖北十堰市检察机关招聘雇员制检察辅助人员22人笔试历年典型考题及解题思路分析附带答.docx
- 2024年中国原色金字塔玩具市场调查研究报告.docx
- 2024年中国燃煤热风炉市场调查研究报告.docx
- 2024年中国生物解剖实验台市场调查研究报告.docx
- 2024年中国膨胀石墨带状密封垫片市场调查研究报告.docx
- 2024年中国禾草灵市场调查研究报告.docx
- [吉林]2024年吉林东北师范大学附属中学春季学期教师招聘笔试历年典型考题及解题思路分析附带答案详解.docx
- [厦门]2024年福建厦门市思明区部分单位联合招聘笔试历年典型考题及解题思路分析附带答案详解.docx
- 2024年中国全塑盒紫檀二胡市场调查研究报告.docx
文档评论(0)