- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
款凯迪拉克CTS轿车 断电后的防盗解除方法
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 李亮物联网关键技术及应用研究.doc
- 李子酒 美食杰.docx
- 李阳疯狂美范文篇.doc
- 条 超级实用健康文摘.doc
- 条健康小常识.doc
- 村委会终终结.doc
- 条最经典的情人节短信.doc
- 条人人必知的健康法则.doc
- 杨华柏新保险法解析.doc
- 条睿智女人的标准.doc
- 高中数学 1-3-1-1 函数的单调性能力强化提升 新人教A版必修1.doc
- -高中语文 第6课辛弃疾词两首同步检测 新人教版必修4 .doc
- 高中物理 1.5 电势差练习 新人教版选修3-1.doc
- 高中英语 Unit4 Making the+news综合测试题 新人教版必修5.doc
- 高中数学 4-2-3 直线与圆的方程的应用能力强化提升 新人教A版必修2.doc
- 高中数学 第一次月综合素能检测 新人教A版必修1.doc
- 高中数学 3.4 简单线性规划(第1课时)练习 北师大版必修5.doc
- 高中数学 2-2-2 平面与平面平行的判定能力强化提升 新人教A版必修2.doc
- 高中数学 1-3-2 球的体积和表面积能力强化提升 新人教A版必修2.doc
- 高中数学 3.3 二元一次不等式组与简单的线性规划问题第3课时练习 .doc
文档评论(0)