- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文 装潢 杨志
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 杭州市健身俱乐部经营状况调查与分析.doc
- 杭州楼市报.docx
- 杨维良胰岛素瘤例的诊断与外科治疗.doc
- 杨静G移动通信技术在城市交通信息系统中的应用研究.doc
- 杭州第一技师学院毕业论文设计.doc
- 杭挂总部薪酬方案必威体育精装版.doc
- 松木山水库水质现状分析与保护措施.doc
- 杭电建校周校庆公关活动策划书.doc
- 果品项目申报指南.doc
- 杭政储安装商务用房二期绿谷杭州浙商创新发展中心项目图纸会审.doc
- 甘肃省白银市会宁县第一中学2025届高三3月份第一次模拟考试化学试卷含解析.doc
- 2025届吉林市第一中学高考考前模拟生物试题含解析.doc
- 四川省三台县芦溪中学2025届高三下第一次测试生物试题含解析.doc
- 2025届江苏省启东市吕四中学高三适应性调研考试历史试题含解析.doc
- 浙江省宁波市十校2025届高三二诊模拟考试历史试卷含解析.doc
- 甘肃省甘南2025届高考生物必刷试卷含解析.doc
- 河北省石家庄市一中、唐山一中等“五个一”名校2025届高考历史四模试卷含解析.doc
- 江西省南昌市进贤一中2025届高考生物考前最后一卷预测卷含解析.doc
- 甘肃省白银市会宁县第四中学2025届高三第二次模拟考试历史试卷含解析.doc
- 宁夏银川市宁夏大学附属中学2025届高考化学押题试卷含解析.doc
文档评论(0)