- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
河北科技师范学院毕业论文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- 杨静G移动通信技术在城市交通信息系统中的应用研究.doc
- 杭州第一技师学院毕业论文设计.doc
- 杭挂总部薪酬方案必威体育精装版.doc
- 松木山水库水质现状分析与保护措施.doc
- 杭电建校周校庆公关活动策划书.doc
- 果品项目申报指南.doc
- 杭政储安装商务用房二期绿谷杭州浙商创新发展中心项目图纸会审.doc
- 枞阳县事业单位公开招聘人员岗位表综合类安庆中公教育.doc
- 林普整合营销传播机构品客策划案.doc
- 板式家具原材料编码原则.doc
- DB23T 3848-2024 人文与自然营商环境监测规范.pdf
- DBJ41T 256-2021 河南省海绵城市设计标准 河南省工程建设标准(住建厅版).docx
- DB64T 2025-2024 城镇道路塌陷隐患探测和风险评估技术标准.pdf
- DBJ41T 272-2022 装配式混凝土建筑施工安全技术标准 河南省工程建设标准(住建厅版).docx
- 初中语文期末作文预测范文《_____的青春最闪耀》.pdf
- 初中语文满分作文七篇.pdf
- 2023-2024学年广东省深圳市龙岗区七年级上学期质量检测数学试卷及答案.docx
- 初中英语作文提分句型+常用格言+提分词汇.docx
- 初中九年级化学下册知识点(人教版).docx
- 2023-2024学年浙江省温州市九年级上学期数学检测试题及答案.pdf
文档评论(0)