- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
江西省科技厅自然青科学基金项目申请书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 毕业论文撰写实施方案修订.doc
- 毕业论文专利池及其发展的分析.doc
- 毕业论文太阳能光伏发电系统研究 副本.doc
- 森林防火监控智能分析系统热成像.doc
- 毕业论文数控机床常见故障的维修.doc
- 模块五 网页设计简约篇.doc
- 武汉汽车改装凯迪拉克XTS加装全景案例.doc
- 毕业论文应化李明轩.doc
- 毕业论文终稿胡中星.doc
- 毕业论文梁国宝.doc
- 2024湖北省2024-2025学年八年级上学期9月归纳小结+英语试题 .pdf
- 2024小学语文四年级下册:天窗核心素养教案 .pdf
- 第13讲 保护水资源-【暑假自学课】2024年新九年级化学暑假提升精品讲义(人教版2024) .pdf
- 双减背景下的小学中高年级英语写的作业设计的研究结题报告 .docx
- Unit2 Colours 单元主题阅读与写作范文15篇-2024-2025学年九年级英语上册重难点讲练全攻略(牛津译林版) .pdf
- 2024新课标人教版八年级上册初中生物核心素养教案新课标课件分层作业 .docx
- 基于结构-过程-结果(SPO)模型的处方前置审核系统的建立及其应用效果 .pdf
- 【大单元整体教学】第二单元《循环的水》 单元整体设计 大象版科学六年级上册 .pdf
- 第五节叶栅气动特性与叶栅损失.pptx
- 渡荆门送别公开课PPT课件一等奖新名师优质课获奖比赛公开课.pptx
文档评论(0)