- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
汽车专用术语汇编e
PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts m
您可能关注的文档
- 毕业论文太阳能光伏发电系统研究 副本.doc
- 森林防火监控智能分析系统热成像.doc
- 毕业论文数控机床常见故障的维修.doc
- 模块五 网页设计简约篇.doc
- 武汉汽车改装凯迪拉克XTS加装全景案例.doc
- 毕业论文应化李明轩.doc
- 毕业论文终稿胡中星.doc
- 毕业论文梁国宝.doc
- 毕业论文王秀敏定稿.doc
- 毕业论文论直销模式的发展.doc
- 教科版(2017秋)科学二年级上册2.6 做一顶帽子 教学设计.docx
- 河北高频考点专训四 质量守恒定律的应用教学设计---2024-2025学年九年级化学人教版(2024)上册.docx
- 大单元教学【核心素养目标】6.3 24时计时法教学设计 人教版三年级下册.docx
- 河南省商城县李集中学2023-2024学年下学期九年级历史中考模拟八(讲评教学设计).docx
- 第18章 第25课时 正方形的性质2023-2024学年八年级下册数学课时分层作业教学设计( 人教版).docx
- Module 8 模块测试 教学设计 2024-2025学年英语外研版八年级上册.docx
- 2024-2025学年小学数学五年级下册浙教版教学设计合集.docx
- 2024-2025学年小学劳动四年级下册人民版《劳动》(2022)教学设计合集.docx
- 2024-2025学年小学数学三年级上册冀教版(2024)教学设计合集.docx
- 2024-2025学年高中生物学必修1《分子与细胞》人教版教学设计合集.docx
文档评论(0)