- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
法学必读书目按门类分类
大学生法律评论社学术部
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mar
您可能关注的文档
- 水晶石虚拟现实介绍.doc
- 水果圣诞联动策划书.doc
- 水电八局地下停车场方案及报价.doc
- 水文学论文作业.doc
- 水电改造过程中需要避免的五大常见误区.doc
- 水电站通信系统.doc
- 水轮发电机基本常识简.doc
- 氨逃逸连续监测系统高温抽取激光法V.doc
- 水资源监测山洪灾害及防汛预警系统招标书.doc
- 水质采样实习.doc
- 莱州市2019-2020学年六年级上期末数学试卷(有答案) .pdf
- 统编版2023-2024学年三年级语文下册第一单元检测(A)卷(含答案).pdf
- 环境工程专业综合考试题库.pdf
- 汽车电气设备构造与维修期末考试试题及答案 .pdf
- 电子商务师初级练习题及答案 .pdf
- 湖北省襄阳市樊城区2023-2024学年七年级上学期期末学业质量监测语文试 .pdf
- 湘教版七年级地理上册期末综合检测试卷(5份,,含答案) .pdf
- 职业健康安全管理体系审核员考试单选题 .pdf
- 计算机安全知识考试题库 .pdf
- 考数学模拟(二模)试题按题型难易度分层分类汇编-03解答题(提升题完整版720954325.pdf
文档评论(0)