- 1、本文档共49页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《流行病学》 第五版 笔记精华
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series bale
您可能关注的文档
- 水肥一体化监控系统解决方案.docx
- 汉学大师陈启云栽治学感悟.doc
- 水电站水资源论证最终稿.doc
- 汉语言文学专业高级涉外文秘方向本科指导性教学计划.doc
- 江淮汽车新能源汽车产业化进程加快朝阳永续【机构专享】.docx
- 汝南产业集聚区综合服务建设项目征求意见稿.doc
- 江苏省普通高校预测卷一.doc
- 江苏省高等学校大学生实践创新训练计划项目申请表任兵.doc
- 江苏行政A卷及解析.doc
- 江苏省戴南高级中学届高三上学期学情调研.doc
- 2024-2030年中国电容器用塑料介电膜行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国电子邮件优化行业市场发展趋势与前景展望战略分析报告.docx
- 项链(莫泊桑)全解课件.pptx
- 骨关节炎的康复护理课件.pptx
- 领先世界的秦汉科学技术正式课件.pptx
- 2025年烟台科技学院单招职业适应性测试题库及答案解析.docx
- 2025年长春职业技术学院单招职业适应性测试题库及答案解析.docx
- 2025年云南特殊教育职业学院单招职业适应性测试题库及答案解析.docx
- 2025年云南锡业职业技术学院单招职业适应性测试题库及答案解析.docx
- 2025年西安医学高等专科学校单招职业适应性测试模拟试题及答案解析.docx
文档评论(0)