- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈酒店服务语言艺术
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 汽车保险与公估实务.doc
- 汽车专用术语汇编e.doc
- 汽车使用及养.doc
- 汽车保险讲解系列一 保险单上那些事儿!.doc
- 池州联通营销渠道优化策略研究初稿.doc
- 汽车品牌大全超全改.doc
- 汽车品牌标志大全[].doc
- 汽车流行趋势.docx
- 汽车基础知识大汇总汽车结构+保养+美容+改装+维修.doc
- 汽车品牌车标产地厂商大全.doc
- 2024版PPT深入分析借壳重组上市 .pdf
- 电大专科《植物病虫害防治学》期末试题标准题库及答案(试卷号.pdf
- 适用于新教材2024版高考地理一轮总复习考点规范练42湘教版 .pdf
- 部编版三年级上册道德与法治期末测试卷含答案【完整版】 .pdf
- 1304-全国-现代汉语自考真题及答案 .pdf
- 重庆市巴南区2023-2024学年八年级上学期期末语文试题(含答案).pdf
- 2024年为公司建言献策100条 .pdf
- 2024年初级会计考试大纲《经济法基础》科目变化 .pdf
- 2024年河南省南阳市邓州市中考二模物理试题(教师版) .pdf
- 跨境电商人才初级认证考试题库200题(含答案)KW .pdf
文档评论(0)