- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
版上消化道出血诊疗方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 温州营业执照检网上申报系统操作流程.doc
- 港澳商务签注及登记备案多次往返办事指南.docx
- 温馨苑房地产开发项目建议书案例模板.doc
- 温州文综一模卷.doc
- 湖北八峰药化T纯化水设备DQ确认.doc
- 湖北襄阳鄂酒文化博览会.doc
- 深圳紫光积阳森林防火指挥中心方案.doc
- 湖北酒店宽带VPN路由器酒店VPN组网方案.doc
- 湖南中粮可口可乐劳动合同书.doc
- 湖南城市学院毕业设计论文材料格式1.doc
- 《GB/Z 44363-2024致热性 医疗器械热原试验的原理和方法》.pdf
- GB/T 16716.6-2024包装与环境 第6部分:有机循环.pdf
- 中国国家标准 GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 《GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统》.pdf
- GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 中国国家标准 GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 44305.2-2024塑料 增塑聚氯乙烯(PVC-P)模塑和挤塑材料 第2部分:试样制备和性能测定.pdf
- 《GB/T 44315-2024科技馆展品设计通用要求》.pdf
- GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 39560.9-2024电子电气产品中某些物质的测定 第9 部分:气相色谱-质谱法(GC-MS)测定聚合物中的六溴环十二烷.pdf
最近下载
- 国家法定41种传染病大全(就诊科室、传播途径、病原体、检测方法等)及防护措施.doc
- QC╱T 1128-2019 汽车用摄像头(报批稿).pdf
- 笔记本电脑图纸Lenovo Ideapad Y470 (Compal LA-6881).pdf
- GB50487-2008 (2022年版) 水利水电工程地质勘察规范.pdf
- 2021卫生高级职称《中西医结合》题库及答案.docx
- 副研究馆员工作总结与计划范文.pdf
- 《幼儿教育中“去小学化”探究》课题结题报告.doc
- 除尘设备检修工艺规程.doc
- 部编版语文四年级上册雪梅(教案).docx VIP
- 【精品】实验小学课本剧《愚公移山》剧本.docx VIP
文档评论(0)