- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
生活窍门和绝招
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 煤炭行业策略研究第期1.doc
- 煤矿项目建设流程[].doc
- 煤炭行业策略研究第期.doc
- 澳门自助旅游攻略路书蚂蜂窝.doc
- 煤矿物资手册共分册.doc
- 煤矿可研徐总安排.doc
- 煤矿地质学教案.doc
- 煤矿用防爆箱和电源配电箱价格.docx
- 版上消化道出血诊疗方案.doc
- 爱情戒律婚姻与指纹的关系.doc
- 2024年九年级语文上册 第四单元 诗词诵读《水调歌头》说课稿 鄂教版.docx
- 2023九年级物理下册 第十八章 电功率第4节 焦耳定律第1课时 焦耳定律说课稿 (新版)新人教版.docx
- 2023九年级数学下册 第二十九章 投影与视图29.docx
- 2023九年级数学下册 第27章 圆27.docx
- 2023九年级物理下册 第二十章 电与磁第3节 电磁铁 电磁继电器第1课时 电磁铁说课稿 (新版)新人教版.docx
- 江苏省扬州市高中英语 Unit 1 Shcool life reading说课稿 牛津译林版必修1.docx
- 2024-2030年中国超聚合基础设施行业市场发展趋势与前景展望战略分析报告.docx
- 第七步预测启动资金课件.pptx
- 2024-2030年中国超级混合自动切冰机行业市场发展趋势与前景展望战略分析报告.docx
- 益生菌的相关知识通用课件.pptx
文档评论(0)