- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ANSY结构分析指南 疲劳
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- ,中国古史复习提纲.doc
- A 决胜端 提升业绩 1.doc
- A 决胜端 提升业绩.doc
- ABCH型营销模式.doc
- ACUR品牌推广策略.doc
- A 中图征文: 面向信息素养教育的数字目录学发展研究与服务创新 重庆图书馆 王小全.doc
- Afjpen做老板更要做大赢家.doc
- andrid多线程讲解 看图理解.doc
- ANSY使用问答精华.doc
- AEUL发热电缆安装技术手册.doc
- DB12 046.89-2011 产品单位产量综合电耗计算方法及限额 第89部分:手机 .docx
- DB12 046.88-2011 产品单位产量综合电耗计算方法及限额 第88部分:晶振 .docx
- DB12T 419-2010 无公害农产品 核桃栽培管理技术规范 .docx
- DB12T 417-2010 沙化和荒漠化监测技术规程.docx
- DB12T 449-2011 民用建筑四防门通用技术条件.docx
- DB12 046.100-2011 产品单位产量综合能耗计算方法及限额 第100部分: 果汁饮料 .docx
- DB12T 427-2010 葱姜蒜中205种农药多残留测定方法-GCMS法.docx
- DB12T 421-2010 有机农产品 甘薯有机栽培技术规范.docx
- DB12T 426-2010 蔬菜水果中205种农药多残留测定方法-GCMS法 .docx
- 《老年人身体康复》精品课件——项目6 中国传统康复技术.pptx
文档评论(0)