- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CRM结论文 浅谈红罐王老吉的品牌定位
PAGE 14
第PAGE 13页
FILENAME 3212180-58fddbae914ee.doc
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by
您可能关注的文档
- ,中国古史复习提纲.doc
- A 决胜端 提升业绩 1.doc
- A 决胜端 提升业绩.doc
- ABCH型营销模式.doc
- ACUR品牌推广策略.doc
- A 中图征文: 面向信息素养教育的数字目录学发展研究与服务创新 重庆图书馆 王小全.doc
- Afjpen做老板更要做大赢家.doc
- andrid多线程讲解 看图理解.doc
- ANSY使用问答精华.doc
- ANSY结构分析指南 疲劳.doc
- 交通局2024年交通建设项目推进座谈会上的工作总结发言报告 .pdf
- 五四青年节座谈会讲话稿(精选20篇) .pdf
- 五一节劳动节表彰主持词 .pdf
- 五四表彰暨青年典型座谈会讲话稿 .pdf
- 云南省昆明市2023-2024学年高一上学期教学测评月考卷政治模拟试题(含答 .pdf
- 一网机考《建筑工程计量与计价》复习资料3 .pdf
- 2021年春季学期党校中青年干部培训班开班式上讲话心得体会 .pdf
- 保育员个人期末总结5篇2021 .pdf
- (人教版部编版)高中历史必修中外历史纲要(年级下册)第二单元测试02含.pdf
- 七年级数学上册第二章单元测试题及答案 完整版完整版721439794.pdf
最近下载
- 核安全文化知识考试参考题库及答案.pdf
- 工程完工验收施工管理工作报告.doc VIP
- 企业征信报告.PDF
- 省级优秀课件第三单元课题一第1课时分子和原子-人教版九年级上册.pptx VIP
- 【山东卷】.山东省潍坊市2024-2025学年2025届高三上学期阶段性监测暨期中考试(11.25-11.27)政治试卷含答案及解析.pdf
- 河北省1:5万地质灾害风险调查评价技术要求.doc VIP
- 六年级【科学(教科版)】电能和磁能-5学习单.docx VIP
- 城市轨道交通一站两区间电话闭塞法.pptx VIP
- 川菜文化论文(精选范文6篇),文化论文.docx
- 平凡之路-钢琴谱 高清正版完整版五线谱.pdf
文档评论(0)